Wallblake Airport 
Client: Wallblake Airport
Main Contractor: Lagan International
Nature of Project: Runway Refurbishment
Average Labour Strength: 4 Operatives
Contract Period: 16 Weeks
Value: £ 375,000
Complete new airfield ground lighting installation to the new runway, apron and taxiways of the airport. Installation of a new PLC control system, Standby diesel generator power facility, High mast Apron flood lighting and the installation of a totally new L.V. distribution system.
|
|